HL-17

Drilling Rig Mobilization Information

Rig name Shipping date Arrival date Customs clearance Period of transport Spudding time Spudded and drilled wells Current status
HL-17

 

May 24, 2012 July 4, 2012 July 17, 2012 July 18, 2012-July 25, 2012 December 23, 2012: 16:00 6 wells spudded, 5 wells drilled The 6th well is under operation.

 

Chinese & Foreign Staff

Drilling crew number Equipment model Number of Chinese staff Number of foreign staff
HL-17

 

70D 9 60

 

Summary of Main Drilling Rig Equipment

Drilling crew number Equipment model Manufacturer Quantity Main configuration state First party Partner
HL-17

 

70D Baoji Petroleum Machinery Manufacturing 1  
Top drive: Frequency conversion room, cable, 1 set, USA National Oilwell, TDS-11SA
Diesel engine: power generator, 3 sets, Sweden VOLVO, VOLVO1343
Diesel engine: power generator, 2 sets, USA Caterpillar, C15
Diesel engine: power generator, 4 sets, USA Caterpillar, CAT3512B
Mud pump: electric motor, injection pump, 3 sets, Baoji Petroleum Machinery Manufacturing, F-1600
Mud tank volume: 292.7M³, 6 tanks, Tianjin Bohai Equipment Zhongcheng Equipment Manufacture Co., Ltd., GK70D
Water tank volume: 109M³, 2 tanks, Tianjin Bohai Equipment Zhongcheng Equipment Manufacture Co., Ltd., GK70D
SCR: generator cabinet, transmission cabinet, Xian Baomei, BM-70O
Shale shaker: None
CONSORCIO Schlumberger